Case Studies & Examples / Ports

“Revised Gerald Desmond Bridge EIR Includes Bike and Pedestrian Path”

Tuesday, December 13, 2011, by James Brasuell

“In a sign of the multi-modal times, the Final Environmental Impact Report for the new Gerald Desmond Bridge….includes a bicycle and pedestrian walkway. The bridge project last made the news in 2010, when the City Council approved the $1.1 billion project, but the draft EIR went to appeal. The proposed bike and pedestrian path is one of two revisions to the draft EIR (the other includes sound mitigation measures for pile driving and drilling during construction).”

To continue reading, visit here.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s